Laguna Beach Water Tank Burn Site Remediation and Restoration Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013091032
- Lead Agency
- Laguna Beach, City of (City of Laguna Beach)
- Document Title
- Laguna Beach Water Tank Burn Site Remediation and Restoration Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/21/2014
- Present Land Use
- LU: Vacant; Z: Laguna Canyon Annexation Area Specific Plan (Open Space/Passive); GPD: Permanent Open Space/Open Space
- Document Description
- Construction of single-family houses on 93.5 acres. The development includes 206 residential lots, associated infrastructure and utilities, a sewer lift station, parks and open space, and stream channel impacts. Stream channel impacts include lowering and widening of the existing channel, a combination of earthen and hardened side slopes, access roads, and maintenance ramps. Additionally, two roadway crossings will be constructed for traffic circulation. These crossings consist of a double 10 by 4 foot box culvert at Cebalo Street, and two double 10 by 4 foot box culverts at Woolpert Lane.
- Contact Information
-
Darren Bradford
RWQCB - San Diego Region
2375 Northside Drive
San Diego, CA 92108
Phone : (760) 619-3356
Location
- Coordinates
- 33°32'32"N 117°46'56"W
- Cities
- Laguna Beach
- Counties
- Orange
- Cross Streets
- Laguna Canyon Road/Phillips Road
- Zip
- 92651
- Total Acres
- 5.9
- Parcel #
- 629-031-03, 629-031-23
- State Highways
- SR-133
Notice of Determination
- Approving Agency
- RWQCB - San Diego Region
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- http://www.lagunabeachcity.net/cityhall/pw/burn_site_remediation_project.asp
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.