Relocation of Aufdenkamp Connection Transmission Main (ACTM) (Lake or Streambed Alteration Agreement No. 1600-2019-0140-R5)

6 Documents in Project

Summary

SCH Number
2013091026
Lead Agency
Caltrans 12 (Santa Ana) (California Department of Transportation, District 12)
Document Title
Relocation of Aufdenkamp Connection Transmission Main (ACTM) (Lake or Streambed Alteration Agreement No. 1600-2019-0140-R5)
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0140-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Santa Margarita Water District. The proposed project involves relocating an underground water main pipeline to accommodate a California Department of Transportation and Orange County Transportation Authority joint freeway widening project. The existing pipe will be excavated, removed through trenching, and a new pipe installed, encased in concrete, and the trench backfilled. The surface treatment of grouted riprap will be returned to its pre-project condition. The project will result in 0.061 acre (120 linear feet) of temporary streambed impacts.

Contact Information
Simona Altman
Department of Fish and Wildlife Region 5
3883 Ruffin Road
San Diego , CA 92123

(858) 467-4283

Location

Counties
Orange
Cross Streets
Interstate 5 bridge at Aliso Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
California Department of Transportation District 12 1750 East 4th Street, Suite 100

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2013091026_1600-2019-0140-r5 NOD & Findings   PDF 354 K