Blackwell Solar Park Project by Blackwell Solar Park, LLC (PP 13237)

6 Documents in Project

Summary

SCH Number
2013091025
Lead Agency
Kern County
Document Title
Blackwell Solar Park Project by Blackwell Solar Park, LLC (PP 13237)
Document Type
EIR - Draft EIR
Received
Present Land Use
Various
Document Description
Blackwell Solar Park, LLC (project proponent), has requested a GPA to amend the Circulation Element of the Kern County General Plan to remove the midsection line reservations of Section 5 and 8 of Township 27S, Range 20 East for the Blackwell Solar Park Project (project). The project proponent is also requesting two CUPs to allow for the construction and operation of a solar photovoltaic (PV) power-generating facility with a capacity of 20 megawatts (MW) of electricity. The project site boundary encompasses a 166-acre portion of an approximately 477-acre parcel [APN: 068-191-21] in unincorporated Kern County, CA. The project site is within the A (Exclusive Agriculture) zoning district. The project site is also within the jurisdictional boundaries of the Kern County General Plan and portions of the site are designated either 8.3 [Extensive Agriculture (min. 20-acre parcel size)] or 8.3/2.5 (Extensive Agriculture/Flood Hazard) by the General Plan. In addition, the project includes a petition to cancel a Williamson Act land use contract (13-2) for approximately 166 acres of farmland used for dry land grazing. The onsite switchgear would be connected to the available 70-kV connection point of the Pacific Gas and Electric Blackwell Substation by stringing a new gen-tie from the switchgear to the substation via underground conduit or aboveground wiring on new or existing poles pursuant to all Kern County and State regulations. There are three options for the gen-tie route that will be analyzed in the EIR.

Contact Information

Name
Matthew Hall
Agency Name
Kern County
Contact Types
Lead/Public Agency

Location

Counties
Kern
Cross Streets
SR 33 and SR 46
Zip
93249
Total Acres
190
Parcel #
068-191-21
State Highways
SR 33 and SR 46
Township
27S
Range
20E
Section
5, 6,8
Base
MDB&M
Other Location Info
Blackwell's Corner

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Energy Commission, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Office of Historic Preservation, Resources Agency, California Department of Fish and Wildlife, Central Region 4 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Central Region 4 (CDFW)
Development Types
Power:Solar (Megawatts 20)
Local Actions
General Plan Amendment, Use Permit, WALUC
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print