Laguna Niguel to San Juan Capistrano Passing Siding project

5 Documents in Project

Summary

SCH Number
2013091008
Lead Agency
Orange County Transportation Authority
Document Title
Laguna Niguel to San Juan Capistrano Passing Siding project
Document Type
NOD - Notice of Determination
Received

Document Description
The project consists of the following features: Construction of 1.8 miles of new passing siding railroad track; relocation of an existing spur track; Construction of new retaining walls; Relocation of existing power poles, fiber optic cables, water and sewer lines; Extension of casings for gas, water, and sewer lines; Removal of CP Avery (MP 193.9); Culvert extensions and toher drainage refinements; Addition of a railroad bridge or box culvert at MP 194.6; Asphalt paving adjacent to Camino Capistrano to accomodate paring for use by railroad at MP 194.6; Reprofiling of approximately 600 feet of Camino Capistrano adjacent to Rancho Capistrano in order to improve grades.

Contact Information
Darren Bradford
RWQCB - San Diego Region
2375 Northside Drive
San Diego, CA 92108

619-521-3356

Location

Coordinates
33°32'52.27"N 117°37'36.10"W
Cities
San Juan Capistrano Laguna Niguel
Counties
Orange
Cross Streets
Camino Capistrano and SR 73
Zip
92675
Total Acres
3.2
State Highways
I-5
Railways
Metrolink Lossan Corridor
Schools
Capistrano Valley HS
Waterways
Oso Creek and Trabuco Creek
Township
7S
Range
8W
Section
25
Base
SBB&M

Notice of Determination

Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No