Laguna Niguel to San Juan Capistrano Passing Siding Project (Lake or Streambed Alteration Agreement No. 1600-2016-0165-R5)
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013091008
- Lead Agency
- Orange County Transportation Authority
- Document Title
- Laguna Niguel to San Juan Capistrano Passing Siding Project (Lake or Streambed Alteration Agreement No. 1600-2016-0165-R5)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/21/2016
- Present Land Use
- commercial, parkland, agriculture, transportation/Agri-bus, community park, open space, planned community, single-family
- Document Description
- Project is limited to those activities described in Permittees Notification of Lake or Streambed Alteration and includes: the addition of passing siding railroad track adjacent to the low flow channel of Oso Creek, relocation of an existing spur track, construction of retaining walls, relocation of existing powerpoles, fiber optic cables, water, and sewer lines; extension of casings for gas, water, and sewer lines, culvert extensions, and addition of railroad bridge or box culvert.
- Contact Information
-
Jennifer Edwards
CDFW
Lead/Public Agency
3883 Ruffin Road
San Diego, CA 92123
Phone : (858) 636-3160
Location
- Coordinates
- 33°32'52.27"N 117°37'36.10"W
- Cities
- Laguna Niguel San Juan Capistrano
- Counties
- Orange
- Cross Streets
- Camino Capistrano and SR 73
- Zip
- 92675
- Total Acres
- 3.2
- State Highways
- I-5
- Railways
- Metrolink Lossan Corridor
- Schools
- Capistrano Valley HS
- Waterways
- Oso Creek and Trabuco Creek
- Township
- 7S
- Range
- 8W
- Section
- 25
- Base
- SBB&M
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3883 Ruffin Road, San Diego, CA 92123
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.