Mesa Outdoor Electronic Billboard

2 Documents in Project

Summary

SCH Number
2013082078
Lead Agency
City of Pittsburg
Document Title
Mesa Outdoor Electronic Billboard
Document Type
NOD - Notice of Determination
Received
Posted
2/6/2014
Present Land Use
GPLUD - Business Commercial Z: - CS
Document Description
The project consists of the construction of a two-side, LED (light-emitting diode), changeable copy billboard on a developed commercial parcel adjacent to State Route 4, west of Century Boulevard. Each face of the billboard will measure 19 feet tall by 34 feet long and will be situated atop a 32-foot tall steel column. The resulting sign and its support structure will have an overall height of 53 feet above grade and will be visible to both eastbound and westbound traffic on State Route 4. The project will be developed in two phases, with the first phase including a static western sign face and LED eastern sign face, and the second phase incorporating two LED sign faces. Display on the sign will change every four seconds, and the sign will be used for general commercial advertising purposes, with limited time allotted for nonprofit community and city event promotion. Construction of the sign requires approval of a license agreement with the city, an exception to the city's sign code regulations in order to allow a billboard sign for general advertising purposes, and building and grading permits from the city. Installation of the sign will also require approval of an Outdoor Advertising Display Permit from the California Department of Transportation.

Contact Information

Name
Alexandra Endress
Agency Name
City of Pittsburg
Contact Types
Lead/Public Agency

Location

Cities
Pittsburg
Counties
Contra Costa
Cross Streets
East Leland Road at Century Blvd
Zip
94565
Total Acres
.1
Parcel #
088-152-017
State Highways
Hwy 4
Railways
UPRR, BNSF
Airports
No
Schools
Stoneman, Highlands,
Waterways
Suisun Bay
Township
2N
Range
1
Section
13
Base
MDB&M

Notice of Determination

Approving Agency
City of Pittsburg
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print