U.S. Highway 101 Pedestrian Undercrossing

3 Documents in Project

Summary

SCH Number
2013082074
Lead Agency
City of Redwood City
Document Title
U.S. Highway 101 Pedestrian Undercrossing
Document Type
NOD - Notice of Determination
Received
Posted
10/27/2016
Present Land Use
Open space / Planned Community District (P)/Mixed Use - Waterfront Neighborhood and Mixed Use - Corridor
Document Description
Project is limited to the activities associated with construction of a joint-use path dedicated to bicycles and pedestrians under the US 101 freeway bridge next to Redwood Creek to connect the Bayfront and Downtown areas of the City of Redwood City. Project activities include constructing a 14-foot wide path with a battered tieback retaining wall with lighting, installing a creek-side retaining wall, installing a drainage system to capture and detain rain water as needed prior to out falling into the creek, installing landscape retaining walls on both entrances to the path under US 101 and constructing a scenic overlook on the west side of the Convention Way looking toward Redwood Creek. The project covered under the Lake and Streambed Alteration Agreement No. 1600-2013-0366-R3 CDFW is executing pursuant to Section 1602 of the Fish and Game Code.

Contact Information

Name
Kevin Fehr
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Redwood City
Counties
San Mateo
Cross Streets
US 101, Bair Island Road, Convention Way
Zip
94603
Total Acres
1.2
Parcel #
052-383-210 and 052-531-020
State Highways
Hwy 101, 82, 84
Railways
Caltrain
Airports
San Carlos
Schools
Arbor Bay School, Boltan ES
Waterways
Various
Township
5S
Range
2E
Section
16
Base
MDB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print