Retrac Way Wolf Creek Bridge Replacement (Streambed Alteration Agreement No. 1600-2015-0165-R2)

3 Documents in Project

Summary

SCH Number
2013082046
Lead Agency
Nevada County
Document Title
Retrac Way Wolf Creek Bridge Replacement (Streambed Alteration Agreement No. 1600-2015-0165-R2)
Document Type
NOD - Notice of Determination
Received
Posted
12/3/2015
Present Land Use
Residential Agriculture (RA-10)/Rural (Rur. 10)
Document Description
CDFW has executed lake and streambed alteration agreement no. 1600-2015-0165-R2, pursuant to section 1602 of the fish and game code to the project applicant, Nevada County Planning Department. The project is limited to the replacement of the existing timber and steel one-lane bridge on Retrac Way over Wolf Creek (17C-084). The bridge does not meet current County and Caltrans design standards for structural components and load carrying capacity. The new structure will be a two-lane, prefabricated single-span (steel or concrete) bridge measuring 28 ft wide and approximately 85 ft long. It will be located on the same alignment as the existing bridge and elevated approximately 2 to 3 ft above the existing grade to better accommodate 100-yr flood events. Work for the replacement bridge would all be above the ordinary flow elevation for the creek channel and work would be performed during low flow months.

Contact Information

Name
Alexandria Dunn
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency

Location

Counties
Nevada
Cross Streets
Retrac Way/McCourtney Road/Lime Klin Road
Total Acres
~1
State Highways
Hwy 49
Airports
Alta Sierra
Waterways
Wolf Creek
Township
15N
Range
8E
Section
33
Base
MDB&M
Other Location Info
Alta Sierra

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.