Clover Valley Reservoir Supply Pipeline Project (Lake or Streambed Alteration Agreement No. 1600-2017-0400-R2)

4 Documents in Project

Summary

SCH Number
2013082044
Lead Agency
Placer County Water Agency
Document Title
Clover Valley Reservoir Supply Pipeline Project (Lake or Streambed Alteration Agreement No. 1600-2017-0400-R2)
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2018
Present Land Use
GP: Rural Residential (1- to 10-acre minimum) Z: F-B-X-DR, 10-acre minimum
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0400-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Placer County Water Agency, as represented by Heather Trejo. The proposed project is limited to the construction of a permanent supply pipeline and intake structure between the gunite-lined section of Antelope Canal and Clover Valley Reservoir. The existing Corrugated Metal Pipe (CMP) in Antelope Canal will be removed and replaced with a box culvert. The pipeline will be buried in an existing dirt road from the canal to the South pond and the pipeline will continue through the pond, then through the existing Union Pacific Railroad culvert that currently connects the two water bodies.

Contact Information

Name
Gabriele Quillman
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
English Colony Way
Zip
95663
Total Acres
3.933
Parcel #
031-101-068-000, 031-101-023-000
State Highways
Hwy 193
Railways
UPRR
Waterways
Clover Valley Creek, Caperton Canal, Antelope Canal
Township
12N
Range
7E
Section
21
Base
MDB&M
Other Location Info
Penryn

Notice of Determination

Approving Agency
Central Valley RWQCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print