Port of Redwood City Maintenance Dredging

3 Documents in Project

Summary

SCH Number
2013082021
Lead Agency
Redwood City (City of Redwood City)
Document Title
Port of Redwood City Maintenance Dredging
Document Type
NOD - Notice of Determination
Received

Document Description
The Project entails removal of sedimentation utilizing either a clamshell bucket from a derrick barge or a barge-mounted excavator at two sites. A total of approximately 34,000 cubic yards (CY) of sediment will be removed at both sites. This amount includes approximately 18,700 CY of sediment removed to a depth of 10 feet below Mean Lower Low Water level (MLLW) with an additional 8,800 CY that may be removed as a function of over-depth dredging to a depth of 11 feet below MLLW at the marina site and 5,400 CY of sediment removed from the F-dock area to a depth of 14 feet below MLLW with an additional 1,100 CY that may be removed as a function of over-depth dredging to a depth of 15 feet below MLLW. The sediment removed from the marina area and F-dock will be transported via bottom dump scow to the aquatic disposal facility, Alcatraz SF-11 or SF-DODS. CDFW is executing a Lake and Streambed Alteration Agreement, Number 1600-2013-0023-R3, pursuant to Section 1602 of the Fish and Game Code to the project Permittee, Port of Redwood City.

Contact Information
Suzanne DeLeon
CDFW Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

831-440-9433

Location

Coordinates
37°30'19.57"N 122°12'35.46"W
Cities
Redwood City
Counties
San Mateo
Cross Streets
Seaport Boulevard
Zip
94063
Total Acres
8.86
Parcel #
054-300-520
State Highways
Hwy 101
Railways
UPRR
Waterways
Redwood Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
675 Seaport Boulevard, Redwood City, CA 94603 Port of Redwood City Don Snaman, 650-306-4150

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A