The Dockweiler Drive Extension to 13th Street - Project S3023
7 Documents in Project
Summary
SCH Number
2013082016
Lead Agency
City of Santa Clarita
Document Title
The Dockweiler Drive Extension to 13th Street - Project S3023
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2018
Present Land Use
Specific Plan (SP) and Mixed Use Neighborhood
Document Description
Project would connect the Dockweiler Drive extension to the existing 13th Street at-grade rail crossing at Railroad Ave. This alignment would require improvements to both Arch Street and 13th Street. This project will provide a fully upgraded railroad crossing at 13th Street and Railroad Avenue. The proposed roadway would be approx. 0.67 miles in length and is designated as a four-lane secondary highway per the Joint Hwy Plan. The proposed ultimate roadway improvements from the 13th Street and Dockweiler Drive intersection to the Master's University property line would consist of a four-lane roadway with a 12-foot raised landscaped median, a 13-foot sidewalk parkway, and a five-foot bike lane on each side. The typical right of way width would be 92 feet. This project would not include a connection of the roadway to Lyons Avenue, a new at-grade rail crossing, or a bridge over the Newhall Creek. This project is also identified as the environmentally superior alternative alignment (Alternative 2) in the EIR.
Contact Information
Name
Carla Callahan
Agency Name
City of Santa Clarita
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Santa Clarita
Counties
Los Angeles
Cross Streets
Railroad Avenue and Lyons Avenue
Zip
91321
Total Acres
9.86
State Highways
Hwy 5, 14
Railways
MTA/Amtrak/BNSF
Airports
No
Schools
Newhall, William S Hart
Waterways
Newhall Creek
Notice of Determination
Approving Agency
City of Santa Clarita
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.