Final Impact Report, GP-13-02, CO-13-12, R-13-02, and PA-13-11

5 Documents in Project

Summary

SCH Number
2013081051
Lead Agency
City of Costa Mesa
Document Title
Final Impact Report, GP-13-02, CO-13-12, R-13-02, and PA-13-11
Document Type
NOD - Notice of Determination
Received
Posted
3/28/2014
Present Land Use
GPD: Industrial Park (MP)/ZD: Commercial Limited (CL)
Document Description
The proposed project site is 4.17 acres and is currently occupied by a 66,000 sf two story office building. The proposed project would replace the office building and surface parking areas with an apartment building and parking structure. Specifically, the project consists of a five-story 240 unit residential apartment building (63 feet overall height) that wraps around a six-story parking structure (57 feet overall height) with 465 parking spaces in the structure and 4 outdoor on-grade parking spaces.

Contact Information

Name
Mel Lee
Agency Name
City of Costa Mesa
Contact Types
Lead/Public Agency

Location

Cities
Costa Mesa
Counties
Orange
Cross Streets
Baker Street and Pullman Avenue
Zip
92626
Total Acres
4.17
Parcel #
427-021-04
State Highways
SR 55, I 405, SR 73
Airports
John Wayne Int'l
Schools
Newport Mesa Unified
Waterways
Santa Ana Channel

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print