Poway Pump Station Secondary Power Source Project

2 Documents in Project

Summary

SCH Number
2013081028
Lead Agency
Ramona Municipal Water District
Document Title
Poway Pump Station Secondary Power Source Project
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2013
Present Land Use
GPLUD: Open Space - Resource Management Z: OS-RM
Document Description
The proposed project is located at the Poway Pump Station at the eastern edge of the City of Poway, in the Blue Sky Ecological Reserve. Lake Ramona is located to the north and Lake Poway is located to the south. The proposed pipeline would be located within an existing dirt access road that is located south of and generally parallels the Green Valley Truck Trail within the Blue Sky Ecological Preserve. The proposed new natural gas powered engine would be located at the existing Poway Pump Station. The Poway Pump Station is located on land owned by the Ramona Municipal Water District. The existing RMWD pipeline easement, which coincides with the dirt access road, traverses land owned by the City of Poway, County of San Diego, and State of California (in association with the Blue Sky Ecological Reserve).

Contact Information

Name
Ricardo Soto
Agency Name
Ramona Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Poway
Counties
San Diego
Cross Streets
Espola Road, Green Valley Truck Trail
Zip
90802
Schools
Chaparral ES and Poway HS
Waterways
Lake Ramona, Lake Poway
Township
13S
Range
1W
Section
30

Notice of Determination

Approving Agency
Ramona Municipal Water District, Board of Directors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print