Solid Waste Facility Permit Revision for Coachella Valley Compost (CVC)
8 Documents in Project
Summary
SCH Number
2013081021
Lead Agency
Riverside County
Document Title
Solid Waste Facility Permit Revision for Coachella Valley Compost (CVC)
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2017
Present Land Use
Compost Facility / N-A (Natural Asset Areas) / PF
Document Description
The project would facilitate administrative and operational changes at CVC, which include, but are not limited to: 1) increasing the size of the CVC leased area by 4.5 acres; 2) increasing the supply of organic material (food waste, green waste, wood waste, etc.) for production of compost and soil amendments from 250 tons per day (tpd) to 785 tpd; 3) processing up to 200 tpd of construction and demolition material; 4) increasing grease trap liquids from 12,500 gallons per day (gpd) to 55,000 gpd; (5) adding animal manure to the list of acceptable organic feedstock; 6) increasing the total number of daily vehicles from the current permitted 169 vehicles to 536 vehicles; 7) relocating the scale and scalehouse; and 8) adding a second scale and an employee breakroom. A detailed project description is provided in Ch. 4 of the EIR.
Contact Information
Name
Ryan Ross
Agency Name
Riverside County Waste Management Department
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Coachella
Counties
Riverside
Cross Streets
Landfill Road
Zip
92236
Total Acres
40
Parcel #
601-340-017
State Highways
I-10
Railways
UPRR
Waterways
Whitewater Stormwater Channel
Township
5S
Range
8E
Section
22
Base
SBB&M
Notice of Determination
Approving Agency
Riverside County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.