Water-Use and Irrigation Efficiency Project

2 Documents in Project

Summary

SCH Number
2013081018
Lead Agency
Buena Vista Water Storage District
Document Title
Water-Use and Irrigation Efficiency Project
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2013
Present Land Use
Various
Document Description
The Water-Use and irrigation Efficiency Project (the Project) consists of three project components, which are: *Elk Reserve Turnouts *West Side Canal Lining *Semitropic Pipeline Turnout The Elk Reserve Turnouts consist of constructing three turnout connections along the eastern side of the East Side Canal to provide water to the Tule Elk State Natural Reserve. The three turnouts are termed the SWP BV2 Turnout, the Well 2 Turnout, and the Booster Pump Turnout. The District's West Side Canal Lining consists of constructing and operating a turnout from Semitropic Water Storage District's existing ten-foot diameter pipeline (referred to as the Semitropic Pipeline) to the West Side Canal. Operation of the Semitropic Pipeline Turnout will eliminate the need for District use of up to 2.5 miles of the West Side Canal, thus reducing water seepage and evaporation over that length of the West Side Canal.

Contact Information

Name
Tim Ashlock
Agency Name
Buena Vista Water Storage District
Contact Types
Lead/Public Agency

Location

Counties
Kern
Zip
93206
State Highways
I-5
Railways
No
Airports
Elk Hills-Buttonwillow
Schools
No
Waterways
Numerous
Other Location Info
Buttonwillow

Notice of Determination

Approving Agency
Buena Vista Water Storage District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print