Well V817 Rose Valley Pipeline Installation Project

2 Documents in Project

Summary

SCH Number
2013081005
Lead Agency
Los Angeles Department of Water and Power
Document Title
Well V817 Rose Valley Pipeline Installation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/12/2015
Present Land Use
GP: OS-40 Z: NR

Document Description
The Well V817 Rose Valley Pipeline Installation Project consists of the installation of an eight-inch polyvinyl chloride (PVC) pipe, approximately 1,500 ft in length, and associated pumping equipment from Well V817 to the First Los Angeles Aqueduct. The project will involve a six month pumping test of Well V817 at a rate of 1.25 cubic ft per second to collect data to improve the estimate of water seepage from Haiwee Reservoir and determine the long-term effects of pumping water from Well V817.

Contact Information
Eduardo Cuevas
Los Angeles Department of Water and Power
111 North Hope Street, Room 1044
Los Angeles, CA 90012

Phone : (213) 367-6376

Location

Coordinates
36°6'2"N 117°57'8.2"W
Counties
Inyo
Cross Streets
Hwy 395 / Dunmovin
Total Acres
1
Parcel #
03704002
State Highways
Hwy 395
Waterways
Los Angeles Aqueduct 1
Township
21S
Range
37E
Section
23
Other Location Info
Rose Valley

Notice of Determination

Approving Agency
Board of Water and Power Commissioners
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
LADWP Environmental Affairs, 111 N Hope Street Rm 1044, Los Angeles, CA 90012

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search