El Centro Town Center Village Apartments
2 Documents in Project
Summary
SCH Number
2013081001
Lead Agency
City of El Centro
Document Title
El Centro Town Center Village Apartments
Document Type
NOD - Notice of Determination
Received
Posted
2/5/2014
Present Land Use
Medium Density Residential, Rural Residential
Document Description
The proposed project would subdivide 41 acres of vacant land into five parcels, and a remainder lot. Three of the parcels would be developed with a 247 unit apartment complex, while the remaining two parcels would not be developed but would be improved with dust preventative ground cover to the satisfaction of the City and the Air Pollution Control District. Apartments would range in size from 1,046 sf to 1,247 sf. Each three story building would be 9,460 sf and the total project building area would be 283,800 sf. A total of 565 parking spaces would be provided, including 240 attached garage spaces, 300 open parking spaces, and 25 garage/storage spaces for rent. The project also includes the expansion of an existing detention basin and related storm water conveyance infrastructure located just north of the proposed apartment site (west of 8th Street and south of Central Drain). When complete, the detention basin would be approximately doubled in size to accommodate a total of 915,840 cubic feet of water. Other site improvements include roadways, bicycle lanes, street trees, curbs, gutters and ADA access ramps, relocation of gas lines, and extension of other utility lines.
Contact Information
Name
Norma Villicana
Agency Name
City of El Centro
Contact Types
Lead/Public Agency
Phone
Location
Cities
El Centro
Counties
Imperial
Cross Streets
Cruickshank Dr., Bradshaw Dr., 8th St., N. Imperial Ave
Zip
92243
Total Acres
41
Parcel #
044-620-043
State Highways
Hwy 86
Railways
UPRR
Airports
Imperial
Notice of Determination
Approving Agency
City of El Centro
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No