Waterman Water Treatment Plant Safety Improvements at the Chemical Storage Area

2 Documents in Project

Summary

SCH Number
2013072062
Lead Agency
Fairfield, City of (City of Fairfield)
Document Title
Waterman Water Treatment Plant Safety Improvements at the Chemical Storage Area
Document Type
NOD - Notice of Determination
Received

Document Description
The Project is located at the Waterman Water Treatment Plant, 2900 Vista Grande, City of Fairfield, Solano County. The Project is limited to the fill and realignment of an unnamed drainage (Drainage), which is a southeast tributary to the main onsite drainage. The Project will fill in the existing Drainage and reroute surface flows underground to facilitate widening the access road to accommodate delivery vehicles. Impacts to the Drainage from Project activities will result in the placement of 139 cubic yards of fill into 183 feet (0.034 acre) of Drainage. To mitigate for the impacts to the Drainage, the City of Fairfield planted native willow and cottonwood cuttings along 317 linear feet of the upper tributary to the Main Drainage. The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2013-0407 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, George Hicks, City of Fairfield.

Contact Information
Lorie Hammerli
California Department of Fish and Wildlife
Bay Delta Region 7329 Silverado Trail
Napa, CA 94558

707 944 5568

Location

Coordinates
38°16'23.92"N 122°4'5.31"W
Cities
Fairfield
Counties
Solano
Cross Streets
Waterman Blvd. and Vista Grande Ave
Zip
94534
Total Acres
56.59
Parcel #
0151-160-290
State Highways
I-80
Waterways
Putah South Canal
Township
5N
Range
2W
Section
15
Base
MDB&M

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
810 Vaca Valley Parkway, Suite 2013 Vacaville CA 95691

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search