Alameda to Coast Guard Island HDPE Conduit Crossing

2 Documents in Project

Summary

SCH Number
2013072044
Lead Agency
Alameda County
Document Title
Alameda to Coast Guard Island HDPE Conduit Crossing
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2013
Present Land Use
General Industrial and Mixed Use
Document Description
The proposed project consists of installing high density polyethylene (HDPE) conduits beneath the Oakland Estuary using Horizontal Directional Drilling (HDD) methods to drill from an entry point on CGI to an exit point across the Estuary on Alameda Island. The HDD would occur under the Estuary at a minimum depth of 60 feet below the proposed dredging limits. The directional boring would allow for the installation of a bundle of three 6-inch conduits. One conduit would house cables for the 12.47kV electrical circuit, a second conduit would be left empty for the installation of a future electrical circuit, and a third conduit would also be left empty for the installation of future communications cable(s) such as fiber optics.

Contact Information

Name
Juan M. Ulloa
Agency Name
Alameda Municipal Power
Contact Types
Lead/Public Agency

Location

Cities
Alameda
Counties
Alameda
Cross Streets
entry: Campbell Blvd & Wake Field Drive; exit: Grand Street & Fortmann Way
Zip
94501
Total Acres
.45
Parcel #
74-96-01; 72-385-44
State Highways
Hwy 880
Airports
Oakland
Waterways
Oakland Estuary

Notice of Determination

Approving Agency
Alameda Municipal Power
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print