Patterson Pass Road Safety Improvement Project

3 Documents in Project

Summary

SCH Number
2013072038
Lead Agency
Alameda County
Document Title
Patterson Pass Road Safety Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/14/2013
Present Land Use
Large Parcel Agriculture
Document Description
The Patterson Pass Road Safety Improvement Project is intended to improve roadway safety along an approx. 1300 feet section of that road, approx. 7 miles east of Livermore. It would reconstruct both lanes and widen the roadway and shoulder adjacent to the eastbound lane approximately 8 feet. The project would include the following components: (1) removing and relocating an existing barbed wire fence approximately 20 feet to the south; (2) placing and compacting soil fill with a 2:1 slope leading from the new gravel shoulder; (3) excavating and reconstructing the road shoulder; (4) placing and compacting aggregate base for the new road section; (5) placing and compacting new asphalt concrete surfacing, (6) placing an aggregate base layer along the road shoulder; and (7) installing a 400 foot long metal guard rail between MP 6.50 and MP 6.58.

Contact Information

Name
Jim Browne
Agency Name
Alameda County Public Works Agency
Contact Types
Lead/Public Agency

Location

Cities
Livermore
Counties
Alameda
Cross Streets
Patterson Pass Road/Cross Road
Total Acres
.51
Waterways
Western Pacific, Southern
Township
3S
Range
3E
Section
12
Base
MDB&M

Notice of Determination

Approving Agency
Alameda County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.