Phase 1 Bay-to-Transit Trail
4 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013072030
- Lead Agency
- City of San Mateo
- Document Title
- Phase 1 Bay-to-Transit Trail
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/24/2014
- Present Land Use
- Caltrain Hayward Park Station and flood control channel
- Document Description
- The proposed project would complete approximately 0.2 mile of the 1.82-mile Bay-to-Transit Trail between Caltrain's Hayward Park Station and South Delaware Street. The proposed path would consist of a 12-foot wide asphalt-paved path and painted center dividing line. Key features include: 1) Pedestrian-scale directed lighting on of 12-foot tall overhead lamp posts spaced every 50 feet along the pathway. 2)Bollard-type lighting and removable bollards to demarcate the trailheads at Hayward Park Station and South Delaware Street. 3) Landscaping with native low-water plants such as vines along the fences and various shrubs and low groundcovers elsewhere as shown in the project plans.
- Contact Information
-
Suzanne DeLeon
California Department of Fish and Wildlife
Lead/Public Agency
Bay Delta Region 7329 Silverado Trail
Napa, CA 94558
Phone : (831) 440-9433
Location
- Cities
- San Mateo
- Counties
- San Mateo
- Cross Streets
- S. Delaware Street, 16th Avenue
- Zip
- 94403
- Total Acres
- .33
- State Highways
- Hwy 92
- Railways
- Caltrain
- Schools
- Sunnybrae, Aragon HS
- Waterways
- 16th Avenue flood control channel
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 330 West 20th Avenue, San Mateo CA 94403
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.