Atlas Copco Mafi-Trench

3 Documents in Project

Summary

SCH Number
2013071096
Lead Agency
City of Santa Maria
Document Title
Atlas Copco Mafi-Trench
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2013
Present Land Use
Vacant, Zoning - Public Facilities, GP - Community Facilities
Document Description
Note: Reference SCH# 2005121171 General Plan amendment/zone change and a Planned Development Permit to allow a 260,000 sf facility on a 20-acre site for engineering, testing, assembling and manufacturing of hydrocarbon expander-compressors, turbines and cryogenic pumps (the project). The project would consolidate two existing facilities at a new location in order to manufacture and test hydrocarbon expander compressors used in natural gas refineries and large cryogenic pumps used in applications in the chemical/petrochemical stream. The project would be constructed in two phases and would also include an electrical substation, electrical control house, test stand, aerial flare, railroad spur, containment structure, septic holding tank, two paint booths, one sandblast booth and various above ground water and gas storage tanks.

Contact Information

Name
Brian Halvorson
Agency Name
City of Santa Maria
Contact Types
Lead/Public Agency

Location

Cities
Santa Maria
Counties
Santa Barbara
Cross Streets
West Stowell Road / "E" Street
Zip
93454
Total Acres
20
Parcel #
117-820-002
State Highways
Route 135
Railways
SMVRR
Airports
SMX
Schools
Liberty ES
Other Location Info
Orcutt

Notice of Determination

Approving Agency
City of Santa Maria
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print