Rio Bravo Hyrdroelectric Project Maintenance Dredging; Agreement 2012-0150-R4
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013071029
- Lead Agency
- Olcese Water District
- Document Title
- Rio Bravo Hyrdroelectric Project Maintenance Dredging; Agreement 2012-0150-R4
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/18/2013
- Present Land Use
- Open Space - Resource Mgmt Area (Agriculture, Flood Plain); Open Space - Slopes Exceeding 30% Suburban Residential; Low Density
- Document Description
- The CA DFW is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant, Olcese Water District. The project includes dredging an area of 2 acres within the reservoir by a suction dredge placed by crane onto a barge in the reservoir near the diversion dam. Approximately 35,000 cubic yards of sediment will be pumped from the dredge to a settling basin through a 12-inch plastic pipe placed on the ground surface.
- Contact Information
-
Kyle Stoner
CA DFW
Lead/Public Agency
Central Region 1234 East Shaw Avenue
Fresno, CA 93710
Phone : 559 243-4014 x352
Location
- Cities
- Bakersfield
- Counties
- Kern
- Zip
- 93306
- Total Acres
- 15.5
- Parcel #
- 397-02-023
- State Highways
- Hwy 178
- Waterways
- Kern River
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Olcese Water District 15701 Highway 178 Bakersfield, CA 93306
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.