Diversion Dam Maintenance Dredging Project, Rio Bravo Hydroelectric Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013071029
- Lead Agency
- Olcese Water District
- Document Title
- Diversion Dam Maintenance Dredging Project, Rio Bravo Hydroelectric Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/14/2013
- Present Land Use
- Open Space - Resource Mgmt Area (Agriculture, Flood Plain); Open Space - Slopes Exceeding 30% Suburban Residential; Low Density
- Document Description
- Maintenance dredging is proposed to remove the sands and sediment that have accumulated from the hydroelectric projects discharges upstream of the project. The proposed project is located on private lands in Kern County, approximately 15 miles northeast of the Bakersfield downtown area. Project lands on the south side of the Kern River are located within the Bakersfield city limits, whereas lands on the north side of river are in Kern County. The purpose of the proposed maintenance dredging is to remove accumulated sediment from the project reservoir to restore operational capacity and reduce operation and maintenance costs. Approximately 35,000-40,000 yd3 of sediment would be removed. The maintenance dredging will have to be done in low flow conditions, October through January in a normal year.
- Contact Information
-
James L. Nickel
Olcese Water District
Lead/Public Agency
PO Box 60679
Bakersfield, CA 93386
Phone : (661) 872-5050
Location
- Cities
- Bakersfield
- Counties
- Kern
- Zip
- 93306
- Total Acres
- 15.5
- Parcel #
- 397-02-023
- State Highways
- Hwy 178
- Waterways
- Kern River
Notice of Determination
- Approving Agency
- Oicese Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- McMurtrey, Hartsock & Worth, 2001 22nd St., Suite 100, Bakersfield CA 93301
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.