Diversion Dam Maintenance Dredging Project, Rio Bravo Hydroelectric Project

3 Documents in Project

Summary

SCH Number
2013071029
Lead Agency
Olcese Water District
Document Title
Diversion Dam Maintenance Dredging Project, Rio Bravo Hydroelectric Project
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2013
Present Land Use
Open Space - Resource Mgmt Area (Agriculture, Flood Plain); Open Space - Slopes Exceeding 30% Suburban Residential; Low Density
Document Description
Maintenance dredging is proposed to remove the sands and sediment that have accumulated from the hydroelectric projects discharges upstream of the project. The proposed project is located on private lands in Kern County, approximately 15 miles northeast of the Bakersfield downtown area. Project lands on the south side of the Kern River are located within the Bakersfield city limits, whereas lands on the north side of river are in Kern County. The purpose of the proposed maintenance dredging is to remove accumulated sediment from the project reservoir to restore operational capacity and reduce operation and maintenance costs. Approximately 35,000-40,000 yd3 of sediment would be removed. The maintenance dredging will have to be done in low flow conditions, October through January in a normal year.

Contact Information

Name
James L. Nickel
Agency Name
Olcese Water District
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Zip
93306
Total Acres
15.5
Parcel #
397-02-023
State Highways
Hwy 178
Waterways
Kern River

Notice of Determination

Approving Agency
Oicese Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print