Sanborn Road/U.S. Highway 101 Interchange and Elvee Drive Improvements

6 Documents in Project

Summary

SCH Number
2013071004
Lead Agency
City of Salinas
Document Title
Sanborn Road/U.S. Highway 101 Interchange and Elvee Drive Improvements
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2014
Present Land Use
Multiple
Document Description
The proposed project is designed to improve operational traffic and circulation conditions at the Sanborn Road/U.S. Highway 101 interchange. It consists of 11 components which range in scope from simple pavement restriping to construction of an approximately 890-foot extension of existing Elvee Drive that also requires construction of a 49-foot long span bridge over the Reclamation Ditch. Other improvements include signalization, construction of a U.S. Highway 101 ramp meter, modification of existing travel/turn lane configurations, reconstruction of approximately 1,400 feet of existing Elvee Drive, restriction of Elvee Drive access from Sanborn Road to right-in/right-out, as well as other minor roadway modifications. Improvements would occur largely within existing City or Caltrans rights-of-way.

Contact Information

Name
Eda Herrera
Agency Name
City of Salinas, Department of Public Works
Contact Types
Lead/Public Agency

Location

Cities
Salinas
Counties
Monterey
Cross Streets
Sanborn Road/U.S. Highway 101 Interchange
Zip
93901
Parcel #
Multiple
State Highways
U.S. Highway 101
Airports
City of Salinas Municipal
Schools
Multiple
Waterways
Reclamation Ditch

Notice of Determination

Approving Agency
City of Salinas
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print