AT&T Foundation Repair Hillside Support
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013062058
- Lead Agency
- City of Calistoga
- Document Title
- AT&T Foundation Repair Hillside Support
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/23/2013
- Present Land Use
- GPD: Downtown Commercial Z: DC-DD
- Document Description
- The project is limited to: 1) removing an ~65 foot long chain link fence, and five existing concrete pads; 2) injecting compaction grouting into the existing building foundation; and 3) installing grade beams ~65 feet long by 1-foot-wide to stabilize a hillside; decomposed granite in four separate areas; an ~11 foot wide by 12 feet long concrete pad; an ~11 foot long ornamental steel fence adjacent to the existing sidewalk; and an ~ 65 foot long, 6 foot high chain link fence at the edge of existing retaining wall. The CA Dept. of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2012-0365-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, AT&T Telephone Company, as represented by Phoebe Hsu.
- Contact Information
-
Suzanne Gilmore
CA Dept. of Fish & Wildlife
Lead/Public Agency
Bay Delta Region 7329 Silverado Trail
Napa, CA 94558
Phone : (707) 944-5536
Location
- Cities
- Calistoga
- Counties
- Napa
- Cross Streets
- 1310 Lincoln Avenue
- Zip
- 94515
- Total Acres
- 10400 sf
- Parcel #
- 011-231-004
- Airports
- defunct Gliderport
- Schools
- Calistoga ES., MS, HS
- Waterways
- Napa River
Notice of Determination
- Approving Agency
- CDFW
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- City of Calistoga Planning & Building Dept. 1232 Washington Street Calistoga, CA 95415
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- N/A
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.