South San Francisco / San Bruno WQCP Wet Weather and Digester Improvements Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8033-110

6 Documents in Project

Summary

SCH Number
2013062051
Lead Agency
South San Francisco, City of (City of South San Francisco)
Document Title
South San Francisco / San Bruno WQCP Wet Weather and Digester Improvements Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8033-110
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes demolition of Digester Control Building 3, and Digesters 1 & 2, with Digester 1 being rebuilt in the same location. Digester 3 will be structurally and mechanically rehabilitated. There will be new support equipment for the new digester system. There also will be thickening equipment constructed on existing pavement and on grad eunder a sun canopy where Digester 2 is currently located. Piping improvements will be ,ade to digester Control Building 2, and the addition of polymer storage facility in the Dissolved Air Flotation Thickeing Building to support a new thickener will be constructed. A digester gas conditioning system will be constructed on a concrete slab that would be plaed on existing grade. A primary sludge screen will be placed on existig paved aareas or on top of existing structures within the footprint.

Contact Information
Carina Grove
State Water Resources Control Board
Division of Financial Assistance 1001 I Street, 16th Floor
Sacramento, CA 95814

916-327-9401

Location

Coordinates
37°38'28"N 122°23'59"W
Cities
South San Francisco
Counties
San Mateo
Cross Streets
195 Belle Aire Rd
Zip
94080
State Highways
Hwy 101
Railways
BART
Airports
San Francisco Int'l
Schools
South San Francisco HS, Ponderosa ES
Waterways
San Francisco Bay, south of Colma Creek

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1001 I Street, 16th Floor, Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A