Marsh Creek Road Safety Improvement 2.0 to 2.2 Miles West of Deer Valley Road, CP# 13-09

5 Documents in Project

Summary

SCH Number
2013062032
Lead Agency
Contra Costa County
Document Title
Marsh Creek Road Safety Improvement 2.0 to 2.2 Miles West of Deer Valley Road, CP# 13-09
Document Type
NOD - Notice of Determination
Received
Posted
6/3/2015
Present Land Use
A-2/AL

Document Description
The Marsh Creek Road Safety Improvement Project (Project) is located on Marsh Creek Road from 2.0 to 2.24 miles west of Deer Valley Road. The Project consists of realigning the curve, replacing the existing 36-inch corrugated metal culvert with a 4-foot precast box culvert, installing wing walls and riprap, widening the travel lanes from 10 feet to 12 feet, and paving 8 feet of the 10 foot shoulders on both sides of the roadway. The project impacts waters of the United States by increasing the culvert size to facilitate animal migration under the highway and effecting erosion control with respect to the new box culvert.

Contact Information
Barry Hilton
Central Valley Regional Water Board
11020 Sun Center Drive # 200
Rancho Cordova, CA 95670

Phone : (916) 464-4709

Location

Coordinates
37°53'26"N 121°48'28.98"W
Cities
Brentwood
Counties
Contra Costa
Cross Streets
Deer Valley Road
State Highways
Countywide
Railways
Countywide
Airports
Buchanan and Byron
Schools
Countywide
Waterways
Countywide

Notice of Determination

Approving Agency
Central Valley Regional Water Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Central Valley Regional Water Board, 11020 Sun Center Drive # 200, Rancho Cordova, CA 95670

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search