Rio Linda Boulevard Bridge Replacement Project
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2013062024
- Lead Agency
- Sacramento, City of (City of Sacramento)
- Document Title
- Rio Linda Boulevard Bridge Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/18/2017
- Present Land Use
- Suburban, Suburban Neighborhood Low, and Parks and Recreation
- Document Description
- To remove and replace an existing bridge with a new cast in place 2-lane bridge with 6-foot shoulders. Pavement rehabilitation will also occur on the approach roadways on both sides of the bridge consisting of removal of existing pavement; replacement of any failed roadway base areas; placement fo new hot mix asphalt pavement; installation of metal beam guardrail; bridge railings; and revegetation plantings.
- Contact Information
-
James Herota
Central Valley Flood Protection Bd.
3310 El Camino Ave. Room 151
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Coordinates
- 38°39'17.95"N 121°26'51.89"W
- Cities
- Sacramento
- Counties
- Sacramento
- Cross Streets
- Rio Linda Blvd and Main Ave
- Zip
- 95838
- Total Acres
- 5
- Parcel #
- 23700400560, 2260240016
- Waterways
- Magpie Creek
- Township
- 9N
- Range
- 5E
- Section
- 10/11
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Ave., Suite 170, Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.