Amendments to Certification and Test Procedures for Vapor Recovery Systems at Gasoline Dispensing Facilities (GDFs) and Cargo Tanks

2 Documents in Project

Summary

SCH Number
2013062006
Lead Agency
California Air Resources Board (ARB)
Document Title
Amendments to Certification and Test Procedures for Vapor Recovery Systems at Gasoline Dispensing Facilities (GDFs) and Cargo Tanks
Document Type
NOD - Notice of Determination
Received
Posted
6/3/2014
Document Description
The amendments to the certification and test procedures were adopted to: (1) Improve two test procedures used by ARB staff during certification of vapor recovery equipment designed for use with aboveground storage tanks (ASTs). The amendments to these test procedures address technical deficiencies that staff encountered during field testing and allow staff to use improved test equipment now available. The minor reorganization of an amendment to these test procedures also improve their clarity and readability; and (2) Revise the certification procedure and three test procedures for equipment used on cargo tanks to control gasoline vapor emissions. The revised certification procedures no longer require cargo tank vapor recovery components to be certified by ARB. Owners/operators are still required to have their cargo tanks certified annually. These test procedures were revised to be more consistent with federal Department of Transportation requirements.

Contact Information

Name
Board Administration and Regulatory Coordination Unit
Agency Name
Air Resources Board
Contact Types
Lead/Public Agency

Location

Regions
Statewide

Notice of Determination

Approving Agency
ARB
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.