Feasibility Study / Remedial Action Plan Asbestos Operable Unit
2 Documents in Project
Summary
SCH Number
2013052068
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Feasibility Study / Remedial Action Plan Asbestos Operable Unit
Document Type
NOD - Notice of Determination
Received
Posted
7/22/2013
Present Land Use
The site is zoned as industrial and is used as a transportation corridor for the UPRR
Document Description
Pursuant to authority under Chapter 6.8, Division 20, CA Health and Safety Code (H&SC), the DTSC is proposing to approve a Remedial Action Plan (RAP), hereafter "the project," that would allow UPRR to conduct activities designed to remediate soil in the Asbestos Operable Unit (hereafter "the Site") located at 833 East 8th Street, Stockton, CA, San Joaquin County. Although the Site is an active rail road that is approximately 24 acres, DTSC oversight was limited to the Asbestos Operable Unit, which is located in the southern portion of the Site.
Contact Information
Name
Duane White
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Stockton
Counties
San Joaquin
Cross Streets
833 East 8th Street, north of the intersection of McKinley Avenue and Industrial Drive
Zip
95206
Total Acres
24
Parcel #
177-02-23, -26, -27, 177-02-72
State Highways
Hwy 99 and 5
Railways
UPRR
Airports
Stockton
Schools
Edison HS
Waterways
McLeod Lake
Township
1N
Range
6E
Section
13
Base
MDB&M
Notice of Determination
Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
No