Crows Landing Road Bridge Over the San Joaquin River

4 Documents in Project

Summary

SCH Number
2013052050
Lead Agency
Stanislaus County
Document Title
Crows Landing Road Bridge Over the San Joaquin River
Document Type
NOD - Notice of Determination
Received

Document Description
Remove existing 670 ft long two lane bridge and replace it with an approx. 670-70 ft long, two-lane bridge (including one 12-ft wide two way lane for safe access to existing levee maintenence roads). Replacement bridge structure and associated roadway approaches and features would be constructed just north of existing roadway and bridge while existing facilities remain intact and used to maintain public through project site. Features would include two bridge abutments (one at each bank), four bridges piers (consisting two columns); and rock slope protection along the banks of the San Joaquin River channel near and around the bridge abutment locations. After new bridge.

Contact Information
David A. Leamon
Stanislaus County, Dept. of Public Works
1010 10th Street Suite 4204
Modesto, CA 95354

209 525 4302

Location

Coordinates
37°25'53"N 121°0'47"W
Cities
Modesto
Counties
Stanislaus
Cross Streets
Crows Landing Road over the San Joaquin River, adjacent to West Carpenter Road
Zip
95358
Total Acres
13
Parcel #
049-003-011, 049-003-010, 057-001
State Highways
SR 33, I-5
Airports
NASA Crows Landing
Waterways
San Joaquin River
Township
6S
Range
9E
Section
7

Notice of Determination

Approving Agency
Stanislaus County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Stanislaus County Publiv Works Dept. 1716 Morgan Rd. Modesto, CA 95358

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search