Oxford Retention Basin Multiuse Enhancement Project

4 Documents in Project

Summary

SCH Number
2013051061
Lead Agency
Los Angeles County
Document Title
Oxford Retention Basin Multiuse Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/7/2015
Present Land Use
Open Space (Marina del Rey Land Use Plan); Specific Plan-Oxford Flood Control Basin

Document Description
The proposed project consists of improvements to flood control infrastructure, water quality, wildlife habitat, aesthetics, and recreational opportunities at Oxford Retention Basin. The project includes, but is not limited to replacing existing tide gates; excavating accumulated sediment from the bottom of the basin; removing contaminated soils along the basin perimeter and replacing it with clear imported fill; removing and replacing existing fencing; retrofit existing catch basin; constructing a new 2-foot high concrete parapet wall along the basin's northern and western rim, a new vegetated circulation berm, bio-retention systems, maintenance access ramps, observation areas, a walk/jog path with wildlife-friendly lighting, benches, trash receptacles, and interpretive signage around the perimeter of the basin; removing and replacing existing vegetation, including removal of approximately 650 trees and replacement with over 650 trees.

Contact Information
Reyna Soriano
Los Angeles County Dept. of Public Works
900 S. Fremont Avenue, 11th Floor
Alhambra, CA 91803-1331

Phone : (626) 458-5192

Location

Coordinates
33°59'9"N 118°27'17"W
Counties
Los Angeles
Cross Streets
Washington Blvd. and Mildred Avenue
Zip
90292
Total Acres
5.21
Parcel #
4224-006-900
Schools
Coeur d. Alene ES
Waterways
Oxford Basin
Township
2S
Range
15W
Section
21
Other Location Info
Marina del Rey

Notice of Determination

Approving Agency
Los Angeles County Flood Control District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
900 S. Fremont Avenue Alhambra 91803

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes