Amendment No. 1 to the agreement between the deapartment of water Resources of the State of California and Antelope Valley-East Kern Water Agency Modification,

4 Documents in Project

Summary

SCH Number
2013051017
Lead Agency
Antelope Valley-East Kern Water Agency
Document Title
Amendment No. 1 to the agreement between the deapartment of water Resources of the State of California and Antelope Valley-East Kern Water Agency Modification,
Document Type
NOD - Notice of Determination
Received

Document Description
The Antelope Valley-East Kern Water Agency Proposes to construct a new 24-inch diameter, 1,900-foot Cement Mortar Lined and Coated (CML&C) steel pipeline for the purpose of groundwater recharge. The pipeline will connect to an existing pump station and turnout structure of the CA Aqueduct. Water conveyed through the pipeline will come from the Agency's State Water Project Table A allocations. The pipeline will be constructed within the State's previously disturbed Right of Way for the CA Aqueduct and a utility easement.

Contact Information
Craig Trombly
Department of Water Resources
State Water Project Analysis 1416 9th Street
Sacramento, CA 95814

916 653 4547

Location

Coordinates
34°48'14"N 118°38'53"W
Counties
Los Angeles
Cross Streets
Near SR-138 and 300th St. West
Zip
93536
Parcel #
3275-003-900, 3275-003-010
State Highways
Hwy 138
Railways
No
Airports
No
Schools
No
Waterways
California Aqueduct
Township
8N
Range
17W
Section
2/11
Base
MDB&M
Other Location Info
Neenach

Notice of Determination

Approving Agency
Department of water Resources
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Antelope Valley-East Kern Water Agnecy 6500 West Avenue N Palmdale, CA 93551 Kora Bitcon 16 653 9313 1416 9th St. Rm. 354 Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search