Point Loma High School Whole Site Modernization and Athletic Facilities Upgrade Project

5 Documents in Project

Summary

SCH Number
2013051011
Lead Agency
San Diego Unified School District
Document Title
Point Loma High School Whole Site Modernization and Athletic Facilities Upgrade Project
Document Type
NOD - Notice of Determination
Received
Posted
5/26/2016
Present Land Use
Point Loma High School
Document Description
Demolish 800 building with a library and classrooms and replace with a three-story building (37,000 sf); Renovate Buildings 200 and 300; Construct external security enclosures and new architectural facades; Construct bus turnout; Demolish existing auto shop and pave area for parking. Construct a new main distribution frame building (150 sf); enhance site security. Athletic Facilities Upgrades; ADA upgrades to existing bleachers; Repair concrete bleachers; Construct elevator and press box at existing bleachers; Construct visitor bleachers, storage, restroom/concessions building and ticket office; Expand practice field; Install field and grandstand lighting; and, replace PA sound system.

Contact Information

Name
Gary Stanford
Agency Name
San Diego Unified School District
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Chatsworth Blvd., Voltaire
Zip
92106
Total Acres
16.4
Airports
San Diego Airport
Schools
Point Loma HS

Notice of Determination

Approving Agency
San Diego Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print