Land Use Permit for a Proposed AT&T Free-Standing Telecommunications Facility (CF#LP12-2134)
2 Documents in Project
Summary
SCH Number
2013042069
Lead Agency
Contra Costa County
Document Title
Land Use Permit for a Proposed AT&T Free-Standing Telecommunications Facility (CF#LP12-2134)
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2013
Present Land Use
The zoning is designated as Agricultural Preserve District (A-4) and the General Plan designation is "Agricultural Land" (AL).
Document Description
The applicant requests approval of a land use permit to establish an AT&T telecommunications facility on an undeveloped lot. The project for the installation of a 74-foot tall free standing telecommunication facility disguised as a monopine tree. The proposed project includes the installation of nine panel antennas, fifteen remote radio units, three surge protector dome units, and one 220-sf equipment shelter, a 12-foot wide paved access road, and a 6-foot high chain link fence. The project also includes the removal of thirteen code protected trees for the construction of the 12 ft wide access road. The subject property is an undeveloped 4 acre parcel located on a steep hill near Carquinez Scenic Drive.
Contact Information
Name
Simar Gill
Agency Name
Contra Costa County - Conservation and Development
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Martinez
Counties
Contra Costa
Parcel #
354-290-010
State Highways
Hwy 4
Railways
Union Bay
Waterways
Carquinez Strait
Notice of Determination
Approving Agency
County of Contra Costa
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.