Three Rivers Bouldin-Tyler Island Gas Pipeline Project

4 Documents in Project

Summary

SCH Number
2013042064
Lead Agency
California State Lands Commission
Document Title
Three Rivers Bouldin-Tyler Island Gas Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
6/25/2013
Present Land Use
Agricultural
Document Description
Three Rivers Acquisition Co. LLC proposes to install and operate a 5,737-foot welded steel 4.5-inch natural gas pipeline to transport natural gas from the existing Summit Exploration (CA), LLC DW 8-1 natural gas well site, located on Bouldin Island, San Joaquin County, to the existing Towne Exploration Company Tyler Island Farms 5-2 natural gas well gathering line, located on Tyler Island, Sacramento County. The proposed pipeline would have a flow capacity of 10,000 million cubic feet of natural gas per day, and would be installed via trenching and horizontal direction drilling. The pipeline would cross the Mokelumne River and State Highway 12, but all surface disturbances would be restricted to private agricultural lands and private roadways. The State Lands Commission action is a 20-year General Lease - Right-of-Way Use through June 20, 2033.

Contact Information

Name
Reid Boggiano
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Location

Cities
Isleton
Counties
Sacramento, San Joaquin
Zip
95641
State Highways
Hwy 12
Waterways
Mokelumne & San Joaquin Rivers; Georgiana & Potato
Township
3N
Range
4E
Section
5-8
Base
MDB&M

Notice of Determination

Approving Agency
CA State Lands Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print