San Jose Water Company Regnart Heights Station Water Tank Replacement Project

2 Documents in Project

Summary

SCH Number
2013042063
Lead Agency
California Department of Public Health (CDPH)
Document Title
San Jose Water Company Regnart Heights Station Water Tank Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/17/2013
Present Land Use
Public Utility Easement
Document Description
The San Jose Water Company (SJWC) is proposing the replacement of the existing Regnart Heights water storage tank, which is aged and in poor condition. The bolted steel tank is currently over 46 years of age. The existing 140,000 gallon tank will be replaced with two new steel water tanks with a combined storage capacity of about 199,000 gallons. The larger tank is approximately 147,000 gallons and the second smaller tank is 52,000 gallons. The smaller tank will be installed while the existing tank is still in service. Once the smaller tank is completed and in service, and the existing tank will be demolished and the larger tank will be built. CDPH will be issuing an amended water supply permit once the new tanks are constructed and operational.

Contact Information

Name
Eric Lacy
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency

Location

Cities
Cupertino
Counties
Santa Clara
Cross Streets
Regnart Road, near the Fremont Open Older Space Reserve
Zip
95014
State Highways
Hwy 85, 280
Schools
various
Waterways
Stevens Creek Reservoir

Notice of Determination

Approving Agency
California Department of Public Health
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print