Shed C Chanel Improvement Project - East Reach (Lake or Streambed Alteration Agreement No. 1600-2017-0352-R2)

26 Documents in Project

Summary

SCH Number
2013042054
Lead Agency
City of Elk Grove
Document Title
Shed C Chanel Improvement Project - East Reach (Lake or Streambed Alteration Agreement No. 1600-2017-0352-R2)
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2018
Present Land Use
Use: Vacant and agricultural/ Z: AG-20/AG-80/ GP: Southeast Policy Area
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0352-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of Elk Grove Public Works Dept. The Shed C Channel Improvement Project - East Reach is one of three components of the Shed C Channel Improvement Program (Program). The Program was identified in the City of Elk Grove's Storm Drain Master Plan is to modify the existing Shed C Channel to a multi-functional drainage corridor with enhanced natural stream and habitat values. The Shed C Channel Improvement Project - East Reach includes a low flow channel that meanders within a larger floodplain corridor providing flood storage and conveyance as well as an opportunity for the creation of wetlands habitat. The project is limited to the widening of the existing East Reach of Shed C Channel, the installation of two culverts, the installation of a prefabricated steel truss bridge, and the construction of four detention basins. The channel widening portion of the project includes grading to bring the channel to a 140-170 foot full bank width, with 3:1 slopes. The low flow channel will be approx. 30 feet wide. !02 will be removed as part of this project.

Contact Information

Name
Kelsey Vella
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Kammerer Road and Bruceville Road
Zip
95758
Total Acres
1,200
Parcel #
Various
State Highways
Hwy 5, 99
Schools
Various
Waterways
Cosumnes River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print