Shed C Channel Improvement Projects–West Reach, East Reach, Middle Reach (Streambed Alteration Agreements, 1600-2017-0429-R2, 1600-2017-0352-R2, 1600-2018-0056)

26 Documents in Project

Summary

SCH Number
2013042054
Lead Agency
City of Elk Grove
Document Title
Shed C Channel Improvement Projects–West Reach, East Reach, Middle Reach (Streambed Alteration Agreements, 1600-2017-0429-R2, 1600-2017-0352-R2, 1600-2018-0056)
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2023
Document Description
The Shed C Channel Improvement Projects represent three components of the Shed C Channel Improvement Program (Program). The Program was identified in the City of Elk Grove’s Storm Drain Master Plan and was further explored in the City of Elk Grove’s Southeast Policy Area Drainage Study. The goal of the program is to modify the existing Shed C Channel to a multi-functional drainage corridor with enhanced natural stream and habitat values. The Shed C Channel Improvement Project – West Reach includes a low flow channel that meanders within a larger floodplain corridor providing flood storage and conveyance as well as an opportunity for the creation of wetlands habitat. The project is limited to the widening of the existing West Reach of Shed C Channel, the installation of two culvert crossings, the construction of two pedestrian steel truss bridges, and the construction of three detention basins. Preliminary grading at the detention basin locations may precede the construction of the basins and is not considered initiation of the project. The channel widening portion of the project includes grading of 0.25 miles to bring the channel to an approximate 235-foot full bank. The low flow channel will be approximately 42 feet wide and will meander through a 207-foot-wide overbank area. The Shed C Channel Improvement Project – East Reach includes a low flow channel that meanders within a larger floodplain corridor providing flood storage and conveyance as well as an opportunity for the creation of wetlands habitat. The project is limited to the widening of the existing East Reach of Shed C Channel, the installation of two culverts, the installation of a prefabricated steel truss bridge, and the construction of four detention basins. The channel widening portion of the project includes grading to bring the channel to a 140–170-foot full bank width, with 3:1 slopes. The low flow channel will be approximately 30 feet wide. 102 trees will be removed as part of this project. The Shed C Channel Improvement Project – Middle Reach includes a low flow channel that meanders within a larger floodplain corridor providing flood storage and conveyance as well as an opportunity for the creation of wetlands habitat. The project is limited to the widening of the existing Middle Reach of Shed C Channel and the installation of a box culvert. The channel widening portion of the project includes grading to bring the channel to an approximate 235-foot full bank width with approximately 3:1 slopes. The low flow channel will be approximately 42 feet wide. The project will tie into the eastern reach with a triple 10 foot by 5-foot box culvert.

Contact Information

Name
Benjamin Huffer
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Sacramento
Regions
Northern California
Waterways
Shed C Channel (tributary to Stone Lakes National Wildlife Refuge)
Other Location Info
West Reach - Latitude 38° 22' 25.20" N, Longitude 121° 24' 45.42" W East Reach - Latitude 38° 22' 42.18" N, Longitude 121° 23' 16.83" W Middle Reach - Latitude 38° 22' 33.61" N, Longitude 121° 24' 14.67" W

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
CDFW's Regional Office

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.