Paulson Road PM 0.92 Culvert Replacement Project

3 Documents in Project

Summary

SCH Number
2013042043
Lead Agency
Santa Cruz County
Document Title
Paulson Road PM 0.92 Culvert Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/20/2013
Present Land Use
County Right of Way
Document Description
The project is limited to the replacement of a 40-foot long by 3-foot diameter corrugated metal pipe (CMP) culvert with a 5-foot invert below road level located on Paulson Road, reconstruction of the slopes and concrete headwalls at the culvert inlet and outlet, and repair of the roadway. The culvert is undermined at the base and has begun to collapse causing undermining of the roadway. Culvert replacement will require reconstruction of roadside slopes and concrete headwalls. The culvert will be replaced with an HDPE culvert of equivalent size or greater. Excavated areas will be backfilled with compacted soil, and exposed soils will be seeded with a native plant mix for erosion control purposes. No disturbance to riparian trees is expected. The CA Dept. of Fish and wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2012-0101-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Joel LaCagnin, Santa Cruz County Department of Public Works.

Contact Information

Name
Melissa Farinha
Agency Name
CA Dept. of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Counties
Santa Cruz
Cross Streets
Casserly Road
Zip
95076
Total Acres
.05
State Highways
Hwy 1
Airports
Watsonville
Waterways
Casserly Creek, College Lake

Notice of Determination

Approving Agency
DFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print