Wastewater Change Petition WW0073

6 Documents in Project

Summary

SCH Number
2013042029
Lead Agency
Biggs, City of (City of Biggs)
Document Title
Wastewater Change Petition WW0073
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2014
Present Land Use
Public Facilities and Agriculture

Document Description
City filed Wastewater Change Petition WW0073 with the State Water Resources Control Board to change the purpose of use and place of use of 0.46 cubic feet per second of treated wastewater. The treated wastewater currently discharged to Lateral K which discharges to Butte Creek, thence the Sacramento River would be discounted. The proposed project will involve the construction of an effluent pump station at the existing WWTP, an underground transmission pipeline from the existing WWTP to the irrigation water delivery system, and an irrigation tailwater collection system.

Contact Information
Katherine Mrowka
State Water Resources Control Board
Division of Water Rights P.O. Box 2000
Sacramento, CA 95812

Phone : (916) 341-5363

Location

Coordinates
39°24'42.74"N 121°42'46.55"W
Cities
Biggs
Counties
Butte
Cross Streets
West Biggs-Gridley Road
State Highways
SR 99
Railways
Yes
Airports
No
Schools
Biggs HS / ES
Waterways
Hamilton Slough / Belding Lateral K
Township
18N
Range
2E
Section
13/14
Base
MDB&M
Other Information
Section Cont.: 23

Notice of Determination

Approving Agency
City of Biggs
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
City of Biggs City Hall 465 C Street Biggs, CA 95917 website: http://www.biggs-ca.gov

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print