Low Water Crossing Replacement Project: 6th Place at Wildwood Creek
2 Documents in Project
Summary
SCH Number
2013041074
Lead Agency
City of Yucaipa
Document Title
Low Water Crossing Replacement Project: 6th Place at Wildwood Creek
Document Type
NOD - Notice of Determination
Received
Posted
7/13/2013
Present Land Use
Floodway (FW)
Document Description
The construction of the proposed project consists of elevating the existing 36-foot wide "at grade" low-water crossing of 6th Place within Wildwood Creek to construct a bridge/box culvert in order to eliminate the existing low-water crossing and alleviate current flooding deficiencies. The total length of the proposed channel improvements will extend a total of ~300 lineal feet along the existing channel alignment. The total length of the resulting street improvements will be 500 feet along the current alignment of 6th Place.
Contact Information
Name
Joseph M. Lambert
Agency Name
City of Yucaipa
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Yucaipa
Counties
San Bernardino
Cross Streets
6th Place at Wildwood Creek between Ave. F, Wildwood Canyon Rd. and Ave. G
Zip
92399
Total Acres
2.1
Parcel #
0318-192-09, 10; 0318-201-49
State Highways
Hwy 1-10
Schools
Dunlap, Valley, Meadow
Waterways
Wildwood Creek
Township
2S
Range
2W
Section
11
Base
SBB&M
Notice of Determination
Approving Agency
City of Yucaipa
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.