R2013-00160/RCUP 201300015/RENV 201300039: Animo Pat Brown Charter High School

2 Documents in Project

Summary

SCH Number
2013041072
Lead Agency
Los Angeles County
Document Title
R2013-00160/RCUP 201300015/RENV 201300039: Animo Pat Brown Charter High School
Document Type
NOD - Notice of Determination
Received
Posted
6/13/2013
Present Land Use
Furniture factory / M-1 (Light Manufacturing) / Industrial
Document Description
Conditional Use Permit to construct and operate a 650-student charter public high school in the M-1 (Light Manufacturing) Zone. The site is currently occupied by warehousing utilized for furniture storage and assembly. The project entails the demolition of all existing industrial structure on the 3.02 acre site and the construction of three buildings totaling 56,211 sf, including 34 classrooms, a multipurpose room, and a 48-space parking lot.

Contact Information

Name
Tyler Montgomery
Agency Name
Los Angeles County Regional Planning
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Beach Street / East 82nd Street (8145-8205 Beach Street)
Zip
90001
Total Acres
3.02
Parcel #
6027-015-003; 6027-015-004
State Highways
No
Railways
BNSF, LACMTA, Alameda Corridor
Airports
No
Schools
7 ES, 4 MS, 2 HS
Waterways
No
Township
2S
Range
13W
Section
28
Base
SBB&M
Other Location Info
Florence-Firestone (unincorporated Los Angeles)

Notice of Determination

Approving Agency
LA County Regional Planning
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print