Santa Barbara County Reliability Project

8 Documents in Project

Summary

SCH Number
2013041070
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Santa Barbara County Reliability Project
Document Type
NOD - Notice of Determination
Received
Posted
4/27/2016
Present Land Use
Carpinteria Sub: Utility, Education, Agriculture, Residential/Utility/Public Facility
Document Description
Involves the removal and/or replacement of existing 66kV sub-transmission structure facilities within the existing utility rights-of-way. Project activities include the installation of marker balls on overhead wires, modification of sub-transmission and substation equipment within existing substations, replacement of line protection relays, installation of telecommunication facilities, removal of sub-transmission infrastructure. The project also includes access road improvements and/or road widening at stream crossings.

Contact Information

Name
Ana Maria Saenz
Agency Name
SWRCB
Contact Types
Lead/Public Agency

Location

Cities
Carpinteria, Santa Barbara, Ventura
Counties
Santa Barbara, Ventura
Cross Streets
Linden Ave and Foothill Rd. (Carpinteria Substation)
Zip
Various
Total Acres
112
Parcel #
Multiple
State Highways
Hwy 192, 1, 150, 33, 126, 101, 2
Railways
Amtrak
Airports
No
Schools
Carpinteria HS, Canaline
Waterways
Franklin Creek, Casitas Creek, Canada Larga
Other Location Info
Buenaventura

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print