Sewer Rehabilitation and Replacement Project

3 Documents in Project

Summary

SCH Number
2013041057
Lead Agency
City of South Pasadena
Document Title
Sewer Rehabilitation and Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2013
Present Land Use
In-street and off-street locations throughout the City (no specific land use/zoning/General Plan designation)
Document Description
The City of South Pasadena is proposing a Sewer Rehabilitation and Replacement Project (proposed project) to rehabilitate and replace the City's aging wastewater collection infrastructure. The proposed project includes rehabilitation of approximately 148,500 linear feet of pipe with a trenchless cured-in-place-pipe (CIPP) technology and replacement of approximately 14,000 linear feet of pipe by open trench construction. The location of the work would include in-street and off-street construction. All but 11 off-street sewer segments, totaling about 1,706 feet, would be rehabilitated using CIPP technology. All of the proposed project impacts are anticipated to be construction-related impacts rather than operational impacts because once the work is completed, the system would operate as it currently does with few, if any, impacts.

Contact Information

Name
Shin Furukawa
Agency Name
City of South Pasadena
Contact Types
Lead/Public Agency

Location

Cities
South Pasadena
Counties
Los Angeles
Zip
91030
Parcel #
Citywide
State Highways
Hwy 110

Notice of Determination

Approving Agency
City of South Pasadena
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print