California Flats Solar Project Final EIR; (DRC2014-00016)
15 Documents in Project
Summary
SCH Number
2013041031
Lead Agency
Monterey County
Document Title
California Flats Solar Project Final EIR; (DRC2014-00016)
Document Type
NOD - Notice of Determination
Received
Posted
7/20/2015
Present Land Use
Grazing/Farmland/160 (F/160) and Permanent Grazing/160 (PG/160)/Agricultural
Document Description
A Conditional Use Permit to improve an existing 3.3 mile long agricultural road, and to establish a 4-acre and 0.5-acre temporary construction staging area adjacent to HW 41. Improvements to the agricultural road include widening from approximately 18 ft to 30 ft, drainage improvements and installation of decomposed granite road base. The proposed improvements to the agricultural road are intended to provide access and to serve an approved 280-MW alternating current (AC) photovoltaic (PV) solar power facility located in unincorporated southeastern Monterey County, known as Cal Flats Solar Project. The Cal Flats Solar Project was approved by the Monterey County Board of Supervisors on February 10, 2015 (Monterey County is the Lead Agency). The 3.3 mile road is located one-mile north of the HW 41 and HW 46 split and Chalome Valley Road, along HW 41. Entrance to the agricultural road is located on the north side of HW 41. The project is located in the Shandon-Carrizo Sub Area of the North County Area Plan.
Contact Information
Name
San Luis Obispo County
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
Monterey
Cross Streets
Highway 41 and Highway 46
Zip
93426
Total Acres
3000
Parcel #
43 parcels
State Highways
Hwy 41, 46
Railways
No
Airports
No
Schools
No
Waterways
Cottonwood Creek (on-site)
Township
24S
Range
15E
Section
12
Other Location Info
Parkfield
Notice of Determination
Approving Agency
County of San Luis Obispo
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.