Nimitz Marine Facility (MarFac) Berthing Wharf and Pier Replacement Project

4 Documents in Project

Summary

SCH Number
2013041022
Lead Agency
University of San Diego
Document Title
Nimitz Marine Facility (MarFac) Berthing Wharf and Pier Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/2/2013
Present Land Use
The project is located on 5.8 acres of waterfront property on the east side of the Point Loma peninsula on San Diego Bay.

Document Description
The proposed project would replace the existing 18,250 square foot pier and 9,517 square foot wharf at Scripps Institution of Oceanography's Nimitz Marine Facility (MARFAC) in Point Loma, San Diego Bay with a facility of similar size/shape, as well as associated utility upgrades. The University approved MARFAC project design on September 17, 2013; the current action is the approval of execution of two ground leases associated with the project.

Contact Information
Charlotte Strem
University of California
Lead/Public Agency
Physical & Environmental Planning 1111 Franklin Street, 6th Floor
Oakland, CA 94607-5200

Phone : (858) 534-3860

Location

Coordinates
32°42'24.39"N 117°14'12.56"W
Cities
San Diego
Counties
San Diego
Cross Streets
297 Rosecrans Street
Zip
92101
Total Acres
5.8
Parcel #
532-5200-800
Airports
Lindberg Field
Waterways
San Diego Bay
Township
5S
Range
3W
Section
830

Notice of Determination

Approving Agency
UC
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
UC San Diego, Physical Planning Office 9500 Gilman Drive, MC 0936 La Jolla, CA 92093-0936

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.