Glendale Narrows Riverwalk Phase II

2 Documents in Project

Summary

SCH Number
2013041018
Lead Agency
Glendale, City of (City of Glendale)
Document Title
Glendale Narrows Riverwalk Phase II
Document Type
NOD - Notice of Determination
Received
Posted
12/18/2014
Present Land Use
Vacant / IND (Industrial) / Industrial

Document Description
Project includes extending the existing Glendale Narrows Riverwalk recreational trail east and south along the Los Angeles River to the Verdugo Wash. Proposed amenities will include a river overlook with seating areas that provide views along the river and into Griffith Park, a small park at the confluence of the Verdugo Wash and the L.A. River, entry gateways and directional signage, signage interpreting the natural and human history of the river with an emphasis on conservation activities along the river, and a pedestrian and cyclist bridge over an existing drainage outlet that would connect the existing and proposed sections of the project.

Contact Information
Carol Carter
California Natural Resources Agency
1416 9th Street, Suite 1311
Sacramento, CA 95814

Phone : (916) 651-7588

Location

Cities
Glendale Glendale, Los Angeles, City of Los Angeles
Counties
Los Angeles
Cross Streets
Northeastern side of Los Angeles River between Flower Street/Fairmont Avenue intersection and Ve
Zip
91201
State Highways
I-5 & SR-134
Waterways
Los Angeles River

Notice of Determination

Approving Agency
California Natural Resources Agency
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
City of Glendale, 633 E. Broadway Rm 103, Glendale, CA 91206-4386 818-548-2140

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search