Remedial Action Plan for Ascon Landfill Site

4 Documents in Project

Summary

SCH Number
2013041010
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
Remedial Action Plan for Ascon Landfill Site
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2015
Present Land Use
Various

Document Description
The project is the implementation of a Remedial Action Plan (RAP) at the Ascon Landfill Site. The RAP generally includes the partial removal of waste materials within the Site and construction of a protective cap over the remaining waste materials.

Contact Information
Safouh Sayed
Department of Toxic Substances Control
5796 Corporate Avenue
Cypress, CA 90630

Phone : (714) 484-5478

Location

Coordinates
33°38'54.26"N 117°58'22.16"W
Cities
Huntington Beach
Counties
Orange
Cross Streets
Magnolia Street and Hamilton Avenue
Zip
93546
Total Acres
38
Parcel #
114-150-75, -78, -79, 80
State Highways
SR-39 and 1
Schools
Edison High School, William Kettler, and John H. Eader Elementar
Waterways
Huntington Beach Flood Control Channel, Santa Ana River
Township
6S
Range
10W
Section
13
Base
SBB&M

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
DTSC, 5796 Corporate Avenue, Cypress, CA 90630-4732 Huntington Beach Central Library, 7111 Talbert Avenue, Huntington Beach, CA 92648 Banning Branch Library, 9281 Banning Avenue, Huntington Beach, CA 92646 www.EnviroStor.dtsc.ca.gov

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search